Great Sacandaga Lake
water level
Daily mean · latest available
758.80 ft
NAVD 1988
Provider date:
At page generation on , this measurement was within seven days of its provider date.
This is a saved snapshot. Compare the provider date above with today: if it is more than seven days old, treat this measurement as stale. Reloading the page does not check the provider.
Source captured . Provisional observations and historical values may be corrected. Refreshing this page does not fetch the provider.
Daily values and exact-date changes
A sampling-complete daily mean is unavailable. The provider reports daily means, but underlying sample completeness has not been verified.
Changes in provider-reported daily means; sampling completeness unverified. These differences do not establish complete daily means.
1-day change
-0.09 ft
2026-09-16 to 2026-09-17
Includes provisional observations.
7-day change
-0.61 ft
2026-09-10 to 2026-09-17
Includes provisional observations.
Only exact calendar dates in the same compatible daily series are compared. Missing dates are not substituted.
Daily mean history
2024-01-01 to 2026-09-18. 969 eligible days of 992; 23 missing or excluded days. Vertical reference: NAVD 1988.
Last 90 captured days
Snapshot year
Full history
Display uses first, minimum, maximum and last values within buckets; gaps stay separate. Statistics and the table use original daily values. Chart units: ft.
Read all 991 original daily records
| Date | Level (ft) | Quality / eligibility |
|---|---|---|
| 2024-01-01 | 764.89 | Approved |
| 2024-01-02 | 765.01 | Approved |
| 2024-01-03 | 765.01 | Approved |
| 2024-01-04 | 764.96 | Approved |
| 2024-01-05 | 764.90 | Approved |
| 2024-01-06 | 764.76 | Approved |
| 2024-01-07 | 764.67 | Approved |
| 2024-01-08 | 764.57 | Approved |
| 2024-01-09 | 764.38 | Approved |
| 2024-01-10 | 764.57 | Approved |
| 2024-01-11 | 764.78 | Approved |
| 2024-01-12 | 764.93 | Approved |
| 2024-01-13 | 765.13 | Approved |
| 2024-01-14 | 765.42 | Approved |
| 2024-01-15 | 765.47 | Approved |
| 2024-01-16 | 765.37 | Approved |
| 2024-01-17 | 765.35 | Approved |
| 2024-01-18 | 765.19 | Approved |
| 2024-01-19 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2024-01-20 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2024-01-21 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2024-01-22 | 764.47 | Approved |
| 2024-01-23 | 764.28 | Approved |
| 2024-01-24 | 764.11 | Approved |
| 2024-01-25 | 763.99 | Approved |
| 2024-01-26 | 764.06 | Approved |
| 2024-01-27 | 764.66 | Approved |
| 2024-01-28 | 765.08 | Approved |
| 2024-01-29 | 765.37 | Approved |
| 2024-01-30 | 765.53 | Approved |
| 2024-01-31 | 765.65 | Approved |
| 2024-02-01 | 765.60 | Approved |
| 2024-02-02 | 765.51 | Approved |
| 2024-02-03 | 765.41 | Approved |
| 2024-02-04 | 765.26 | Approved |
| 2024-02-05 | 765.09 | Approved |
| 2024-02-06 | 764.89 | Approved |
| 2024-02-07 | 764.68 | Approved |
| 2024-02-08 | 764.47 | Approved |
| 2024-02-09 | 764.28 | Approved |
| 2024-02-10 | 764.10 | Approved |
| 2024-02-11 | 763.98 | Approved |
| 2024-02-12 | 763.83 | Approved |
| 2024-02-13 | 763.68 | Approved |
| 2024-02-14 | 763.54 | Approved |
| 2024-02-15 | 763.31 | Approved |
| 2024-02-16 | 763.14 | Approved |
| 2024-02-17 | 762.94 | Approved |
| 2024-02-18 | 762.72 | Approved |
| 2024-02-19 | 762.51 | Approved |
| 2024-02-20 | 762.26 | Approved |
| 2024-02-21 | 762.04 | Approved |
| 2024-02-22 | 761.80 | Approved |
| 2024-02-23 | 761.57 | Approved |
| 2024-02-24 | 761.33 | Approved |
| 2024-02-25 | 761.07 | Approved |
| 2024-02-26 | 760.82 | Approved |
| 2024-02-27 | 760.56 | Approved |
| 2024-02-28 | 760.42 | Approved |
| 2024-02-29 | 760.49 | Approved |
| 2024-03-01 | 760.52 | Approved |
| 2024-03-02 | 760.47 | Approved |
| 2024-03-03 | 760.47 | Approved |
| 2024-03-04 | 760.55 | Approved |
| 2024-03-05 | 760.80 | Approved |
| 2024-03-06 | 761.46 | Approved |
| 2024-03-07 | 762.80 | Approved |
| 2024-03-08 | 764.10 | Approved |
| 2024-03-09 | 764.79 | Approved |
| 2024-03-10 | 765.53 | Approved |
| 2024-03-11 | 766.10 | Approved |
| 2024-03-12 | 766.41 | Approved |
| 2024-03-13 | 766.71 | Approved |
| 2024-03-14 | 767.04 | Approved |
| 2024-03-15 | 767.53 | Approved |
| 2024-03-16 | 768.13 | Approved |
| 2024-03-17 | 768.60 | Approved |
| 2024-03-18 | 768.96 | Approved |
| 2024-03-19 | 769.09 | Approved |
| 2024-03-20 | 769.16 | Approved |
| 2024-03-21 | 769.18 | Approved |
| 2024-03-22 | 769.01 | Approved |
| 2024-03-23 | 768.98 | Approved |
| 2024-03-24 | 768.98 | Approved |
| 2024-03-25 | 768.84 | Approved |
| 2024-03-26 | 768.77 | Approved |
| 2024-03-27 | 768.66 | Approved |
| 2024-03-28 | 768.63 | Approved |
| 2024-03-29 | 768.69 | Approved |
| 2024-03-30 | 768.71 | Approved |
| 2024-03-31 | 768.69 | Approved |
| 2024-04-01 | 768.62 | Approved |
| 2024-04-02 | 768.55 | Approved |
| 2024-04-03 | 768.51 | Approved |
| 2024-04-04 | 768.64 | Approved |
| 2024-04-05 | 768.71 | Approved |
| 2024-04-06 | 768.65 | Approved |
| 2024-04-07 | 768.60 | Approved |
| 2024-04-08 | 768.61 | Approved |
| 2024-04-09 | 768.65 | Approved |
| 2024-04-10 | 768.84 | Approved |
| 2024-04-11 | 769.07 | Approved |
| 2024-04-12 | 769.46 | Approved |
| 2024-04-13 | 770.38 | Approved |
| 2024-04-14 | 770.71 | Approved |
| 2024-04-15 | 770.82 | Approved |
| 2024-04-16 | 770.70 | Approved |
| 2024-04-17 | 770.35 | Approved |
| 2024-04-18 | 770.17 | Approved |
| 2024-04-19 | 769.92 | Approved |
| 2024-04-20 | 769.76 | Approved |
| 2024-04-21 | 769.52 | Approved |
| 2024-04-22 | 769.25 | Approved |
| 2024-04-23 | 769.09 | Approved |
| 2024-04-24 | 768.82 | Approved |
| 2024-04-25 | 768.60 | Approved |
| 2024-04-26 | 768.28 | Approved |
| 2024-04-27 | 768.07 | Approved |
| 2024-04-28 | 767.89 | Approved |
| 2024-04-29 | 767.65 | Approved |
| 2024-04-30 | 767.62 | Approved |
| 2024-05-01 | 767.65 | Approved |
| 2024-05-02 | 767.60 | Approved |
| 2024-05-03 | 767.45 | Approved |
| 2024-05-04 | 767.29 | Approved |
| 2024-05-05 | 767.21 | Approved |
| 2024-05-06 | 767.33 | Approved |
| 2024-05-07 | 767.29 | Approved |
| 2024-05-08 | 767.28 | Approved |
| 2024-05-09 | 767.28 | Approved |
| 2024-05-10 | 767.38 | Approved |
| 2024-05-11 | 767.53 | Approved |
| 2024-05-12 | 767.53 | Approved |
| 2024-05-13 | 767.40 | Approved |
| 2024-05-14 | 767.25 | Approved |
| 2024-05-15 | 767.26 | Approved |
| 2024-05-16 | 767.41 | Approved |
| 2024-05-17 | 767.54 | Approved |
| 2024-05-18 | 767.46 | Approved |
| 2024-05-19 | 767.29 | Approved |
| 2024-05-20 | 767.10 | Approved |
| 2024-05-21 | 766.98 | Approved |
| 2024-05-22 | 766.97 | Approved |
| 2024-05-23 | 767.02 | Approved |
| 2024-05-24 | 767.05 | Approved |
| 2024-05-25 | 766.96 | Approved |
| 2024-05-26 | 766.92 | Approved |
| 2024-05-27 | 766.93 | Approved |
| 2024-05-28 | 767.15 | Approved |
| 2024-05-29 | 767.18 | Approved |
| 2024-05-30 | 767.18 | Approved |
| 2024-05-31 | 767.18 | Approved |
| 2024-06-01 | 767.14 | Approved |
| 2024-06-02 | 767.07 | Approved |
| 2024-06-03 | 767.02 | Approved |
| 2024-06-04 | 766.97 | Approved |
| 2024-06-05 | 766.90 | Approved |
| 2024-06-06 | 766.86 | Approved |
| 2024-06-07 | 766.94 | Approved |
| 2024-06-08 | 766.96 | Approved |
| 2024-06-09 | 766.96 | Approved |
| 2024-06-10 | 767.01 | Approved |
| 2024-06-11 | 766.97 | Approved |
| 2024-06-12 | 766.94 | Approved |
| 2024-06-13 | 766.91 | Approved |
| 2024-06-14 | 766.90 | Approved |
| 2024-06-15 | 766.82 | Approved |
| 2024-06-16 | 766.75 | Approved |
| 2024-06-17 | 766.72 | Approved |
| 2024-06-18 | 766.67 | Approved |
| 2024-06-19 | 766.61 | Approved |
| 2024-06-20 | 766.57 | Approved |
| 2024-06-21 | 766.49 | Approved |
| 2024-06-22 | 766.53 | Approved |
| 2024-06-23 | 766.65 | Approved |
| 2024-06-24 | 766.68 | Approved |
| 2024-06-25 | 766.65 | Approved |
| 2024-06-26 | 766.60 | Approved |
| 2024-06-27 | 766.53 | Approved |
| 2024-06-28 | 766.40 | Approved |
| 2024-06-29 | 766.35 | Approved |
| 2024-06-30 | 766.40 | Approved |
| 2024-07-01 | 766.34 | Approved |
| 2024-07-02 | 766.29 | Approved |
| 2024-07-03 | 766.23 | Approved |
| 2024-07-04 | 766.16 | Approved |
| 2024-07-05 | 766.06 | Approved |
| 2024-07-06 | 766.01 | Approved |
| 2024-07-07 | 765.94 | Approved |
| 2024-07-08 | 765.82 | Approved |
| 2024-07-09 | 765.72 | Approved |
| 2024-07-10 | 765.62 | Approved |
| 2024-07-11 | 765.58 | Approved |
| 2024-07-12 | 765.51 | Approved |
| 2024-07-13 | 765.43 | Approved |
| 2024-07-14 | 765.34 | Approved |
| 2024-07-15 | 765.27 | Approved |
| 2024-07-16 | 765.26 | Approved |
| 2024-07-17 | 765.28 | Approved |
| 2024-07-18 | 765.25 | Approved |
| 2024-07-19 | 765.16 | Approved |
| 2024-07-20 | 765.08 | Approved |
| 2024-07-21 | 764.95 | Approved |
| 2024-07-22 | 764.85 | Approved |
| 2024-07-23 | 764.76 | Approved |
| 2024-07-24 | 764.68 | Approved |
| 2024-07-25 | 764.69 | Approved |
| 2024-07-26 | 764.60 | Approved |
| 2024-07-27 | 764.52 | Approved |
| 2024-07-28 | 764.43 | Approved |
| 2024-07-29 | 764.33 | Approved |
| 2024-07-30 | 764.22 | Approved |
| 2024-07-31 | 764.17 | Approved |
| 2024-08-01 | 764.13 | Approved |
| 2024-08-02 | 764.03 | Approved |
| 2024-08-03 | 764.00 | Approved |
| 2024-08-04 | 763.97 | Approved |
| 2024-08-05 | 763.87 | Approved |
| 2024-08-06 | 763.80 | Approved |
| 2024-08-07 | 763.72 | Approved |
| 2024-08-08 | 763.54 | Approved |
| 2024-08-09 | 763.50 | Approved |
| 2024-08-10 | 764.00 | Approved |
| 2024-08-11 | 764.26 | Approved |
| 2024-08-12 | 764.38 | Approved |
| 2024-08-13 | 764.43 | Approved |
| 2024-08-14 | 764.47 | Approved |
| 2024-08-15 | 764.48 | Approved |
| 2024-08-16 | 764.45 | Approved |
| 2024-08-17 | 764.40 | Approved |
| 2024-08-18 | 764.33 | Approved |
| 2024-08-19 | 764.26 | Approved |
| 2024-08-20 | 764.11 | Approved |
| 2024-08-21 | 763.93 | Approved |
| 2024-08-22 | 763.72 | Approved |
| 2024-08-23 | 763.52 | Approved |
| 2024-08-24 | 763.29 | Approved |
| 2024-08-25 | 763.07 | Approved |
| 2024-08-26 | 762.86 | Approved |
| 2024-08-27 | 762.66 | Approved |
| 2024-08-28 | 762.49 | Approved |
| 2024-08-29 | 762.37 | Approved |
| 2024-08-30 | 762.28 | Approved |
| 2024-08-31 | 762.19 | Approved |
| 2024-09-01 | 762.11 | Approved |
| 2024-09-02 | 761.97 | Approved |
| 2024-09-03 | 761.85 | Approved |
| 2024-09-04 | 761.72 | Approved |
| 2024-09-05 | 761.60 | Approved |
| 2024-09-06 | 761.48 | Approved |
| 2024-09-07 | 761.39 | Approved |
| 2024-09-08 | 761.35 | Approved |
| 2024-09-09 | 761.19 | Approved |
| 2024-09-10 | 761.08 | Approved |
| 2024-09-11 | 760.98 | Approved |
| 2024-09-12 | 760.89 | Approved |
| 2024-09-13 | 760.80 | Approved |
| 2024-09-14 | 760.71 | Approved |
| 2024-09-15 | 760.62 | Approved |
| 2024-09-16 | 760.50 | Approved |
| 2024-09-17 | 760.38 | Approved |
| 2024-09-18 | 760.26 | Approved |
| 2024-09-19 | 760.14 | Approved |
| 2024-09-20 | 760.01 | Approved |
| 2024-09-21 | 759.89 | Approved |
| 2024-09-22 | 759.76 | Approved |
| 2024-09-23 | 759.63 | Approved |
| 2024-09-24 | 759.50 | Approved |
| 2024-09-25 | 759.38 | Approved |
| 2024-09-26 | 759.34 | Approved |
| 2024-09-27 | 759.32 | Approved |
| 2024-09-28 | 759.23 | Approved |
| 2024-09-29 | 759.18 | Approved |
| 2024-09-30 | 759.06 | Approved |
| 2024-10-01 | 758.96 | Approved |
| 2024-10-02 | 758.85 | Approved |
| 2024-10-03 | 758.74 | Approved |
| 2024-10-04 | 758.62 | Approved |
| 2024-10-05 | 758.50 | Approved |
| 2024-10-06 | 758.38 | Approved |
| 2024-10-07 | 758.28 | Approved |
| 2024-10-08 | 758.15 | Approved |
| 2024-10-09 | 758.04 | Approved |
| 2024-10-10 | 757.90 | Approved |
| 2024-10-11 | 757.79 | Approved |
| 2024-10-12 | 757.66 | Approved |
| 2024-10-13 | 757.50 | Approved |
| 2024-10-14 | 757.46 | Approved |
| 2024-10-15 | 757.46 | Approved |
| 2024-10-16 | 757.34 | Approved |
| 2024-10-17 | 757.23 | Approved |
| 2024-10-18 | 757.13 | Approved |
| 2024-10-19 | 757.03 | Approved |
| 2024-10-20 | 756.95 | Approved |
| 2024-10-21 | 756.84 | Approved |
| 2024-10-22 | 756.73 | Approved |
| 2024-10-23 | 756.67 | Approved |
| 2024-10-24 | 756.56 | Approved |
| 2024-10-25 | 756.46 | Approved |
| 2024-10-26 | 756.38 | Approved |
| 2024-10-27 | 756.27 | Approved |
| 2024-10-28 | 756.09 | Approved |
| 2024-10-29 | 756.04 | Approved |
| 2024-10-30 | 755.99 | Approved |
| 2024-10-31 | 755.93 | Approved |
| 2024-11-01 | 755.90 | Approved |
| 2024-11-02 | 755.77 | Approved |
| 2024-11-03 | 755.67 | Approved |
| 2024-11-04 | 755.60 | Approved |
| 2024-11-05 | 755.54 | Approved |
| 2024-11-06 | 755.49 | Approved |
| 2024-11-07 | 755.42 | Approved |
| 2024-11-08 | 755.37 | Approved |
| 2024-11-09 | 755.24 | Approved |
| 2024-11-10 | 755.15 | Approved |
| 2024-11-11 | 755.13 | Approved |
| 2024-11-12 | 755.00 | Approved |
| 2024-11-13 | 754.89 | Approved |
| 2024-11-14 | 754.81 | Approved |
| 2024-11-15 | 754.73 | Approved |
| 2024-11-16 | 754.67 | Approved |
| 2024-11-17 | 754.57 | Approved |
| 2024-11-18 | 754.47 | Approved |
| 2024-11-19 | 754.37 | Approved |
| 2024-11-20 | 754.27 | Approved |
| 2024-11-21 | 754.23 | Approved |
| 2024-11-22 | 754.20 | Approved |
| 2024-11-23 | 754.32 | Approved |
| 2024-11-24 | 754.32 | Approved |
| 2024-11-25 | 754.23 | Approved |
| 2024-11-26 | 754.23 | Approved |
| 2024-11-27 | 754.25 | Approved |
| 2024-11-28 | 754.26 | Approved |
| 2024-11-29 | 754.38 | Approved |
| 2024-11-30 | 754.40 | Approved |
| 2024-12-01 | 754.36 | Approved |
| 2024-12-02 | 754.28 | Approved |
| 2024-12-03 | 754.23 | Approved |
| 2024-12-04 | 754.13 | Approved |
| 2024-12-05 | 754.08 | Approved |
| 2024-12-06 | 753.96 | Approved |
| 2024-12-07 | 753.84 | Approved |
| 2024-12-08 | 753.74 | Approved |
| 2024-12-09 | 753.57 | Approved |
| 2024-12-10 | 753.56 | Approved |
| 2024-12-11 | 753.75 | Approved |
| 2024-12-12 | 754.86 | Approved |
| 2024-12-13 | 755.35 | Approved |
| 2024-12-14 | 755.46 | Approved |
| 2024-12-15 | 755.42 | Approved |
| 2024-12-16 | 755.38 | Approved |
| 2024-12-17 | 755.37 | Approved |
| 2024-12-18 | 755.40 | Approved |
| 2024-12-19 | 755.51 | Approved |
| 2024-12-20 | 755.49 | Approved |
| 2024-12-21 | 755.45 | Approved |
| 2024-12-22 | 755.24 | Approved |
| 2024-12-23 | 754.97 | Approved |
| 2024-12-24 | 754.73 | Approved |
| 2024-12-25 | 754.49 | Approved |
| 2024-12-26 | 754.25 | Approved |
| 2024-12-27 | 754.02 | Approved |
| 2024-12-28 | 753.90 | Approved |
| 2024-12-29 | 753.76 | Approved |
| 2024-12-30 | 753.84 | Approved |
| 2024-12-31 | 754.34 | Approved |
| 2025-01-01 | 754.73 | Approved |
| 2025-01-02 | 755.01 | Approved |
| 2025-01-03 | 755.15 | Approved |
| 2025-01-04 | 755.19 | Approved |
| 2025-01-05 | 755.19 | Approved |
| 2025-01-06 | 755.12 | Approved |
| 2025-01-07 | 755.10 | Approved |
| 2025-01-08 | 754.98 | Approved |
| 2025-01-09 | 754.74 | Approved |
| 2025-01-10 | 754.44 | Approved |
| 2025-01-11 | 754.16 | Approved |
| 2025-01-12 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-13 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-14 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-15 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-16 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-17 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-18 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-19 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-20 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-21 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-22 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-23 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-24 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-25 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-26 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-27 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-28 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-29 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-01-30 | 749.98 | Approved |
| 2025-01-31 | 749.93 | Approved |
| 2025-02-01 | 749.90 | Approved |
| 2025-02-02 | 749.85 | Approved |
| 2025-02-03 | 749.82 | Approved |
| 2025-02-04 | 749.80 | Approved |
| 2025-02-05 | 749.74 | Approved |
| 2025-02-06 | 749.71 | Approved |
| 2025-02-07 | 749.70 | Approved |
| 2025-02-08 | 749.64 | Approved |
| 2025-02-09 | 749.62 | Approved |
| 2025-02-10 | 749.57 | Approved |
| 2025-02-11 | 749.52 | Approved |
| 2025-02-12 | 749.45 | Approved |
| 2025-02-13 | 749.47 | Approved |
| 2025-02-14 | 749.44 | Approved |
| 2025-02-15 | 749.37 | Approved |
| 2025-02-16 | 749.40 | Approved |
| 2025-02-17 | 749.44 | Approved |
| 2025-02-18 | 749.39 | Approved |
| 2025-02-19 | 749.33 | Approved |
| 2025-02-20 | 749.27 | Approved |
| 2025-02-21 | 749.24 | Approved |
| 2025-02-22 | 749.16 | Approved |
| 2025-02-23 | 749.11 | Approved |
| 2025-02-24 | 749.03 | Approved |
| 2025-02-25 | 748.99 | Approved |
| 2025-02-26 | 748.97 | Approved |
| 2025-02-27 | 748.94 | Approved |
| 2025-02-28 | 748.94 | Approved |
| 2025-03-01 | 748.94 | Approved |
| 2025-03-02 | 748.92 | Approved |
| 2025-03-03 | 748.87 | Approved |
| 2025-03-04 | 748.82 | Approved |
| 2025-03-05 | 748.80 | Approved |
| 2025-03-06 | 749.01 | Approved |
| 2025-03-07 | 749.43 | Approved |
| 2025-03-08 | 749.75 | Approved |
| 2025-03-09 | 749.94 | Approved |
| 2025-03-10 | 750.08 | Approved |
| 2025-03-11 | 750.20 | Approved |
| 2025-03-12 | 750.41 | Approved |
| 2025-03-13 | 750.63 | Approved |
| 2025-03-14 | 750.82 | Approved |
| 2025-03-15 | 751.06 | Approved |
| 2025-03-16 | 751.49 | Approved |
| 2025-03-17 | 753.00 | Approved |
| 2025-03-18 | 754.39 | Approved |
| 2025-03-19 | 755.15 | Approved |
| 2025-03-20 | 755.84 | Approved |
| 2025-03-21 | 756.70 | Approved |
| 2025-03-22 | 757.42 | Approved |
| 2025-03-23 | 757.90 | Approved |
| 2025-03-24 | 758.27 | Approved |
| 2025-03-25 | 758.61 | Approved |
| 2025-03-26 | 758.84 | Approved |
| 2025-03-27 | 758.98 | Approved |
| 2025-03-28 | 759.09 | Approved |
| 2025-03-29 | 759.22 | Approved |
| 2025-03-30 | 759.64 | Approved |
| 2025-03-31 | 760.24 | Approved |
| 2025-04-01 | 760.95 | Approved |
| 2025-04-02 | 761.44 | Approved |
| 2025-04-03 | 762.15 | Approved |
| 2025-04-04 | 763.12 | Approved |
| 2025-04-05 | 763.84 | Approved |
| 2025-04-06 | 764.59 | Approved |
| 2025-04-07 | 765.15 | Approved |
| 2025-04-08 | 765.69 | Approved |
| 2025-04-09 | 765.95 | Approved |
| 2025-04-10 | 766.17 | Approved |
| 2025-04-11 | 766.38 | Approved |
| 2025-04-12 | 766.54 | Approved |
| 2025-04-13 | 766.70 | Approved |
| 2025-04-14 | 766.86 | Approved |
| 2025-04-15 | 767.00 | Approved |
| 2025-04-16 | 767.11 | Approved |
| 2025-04-17 | 767.10 | Approved |
| 2025-04-18 | 767.08 | Approved |
| 2025-04-19 | 767.13 | Approved |
| 2025-04-20 | 767.18 | Approved |
| 2025-04-21 | 767.20 | Approved |
| 2025-04-22 | 767.29 | Approved |
| 2025-04-23 | 767.28 | Approved |
| 2025-04-24 | 767.26 | Approved |
| 2025-04-25 | 767.23 | Approved |
| 2025-04-26 | 767.33 | Approved |
| 2025-04-27 | 767.39 | Approved |
| 2025-04-28 | 767.43 | Approved |
| 2025-04-29 | 767.46 | Approved |
| 2025-04-30 | 767.57 | Approved |
| 2025-05-01 | 767.60 | Approved |
| 2025-05-02 | 767.65 | Approved |
| 2025-05-03 | 767.67 | Approved |
| 2025-05-04 | 767.71 | Approved |
| 2025-05-05 | 767.89 | Approved |
| 2025-05-06 | 768.60 | Approved |
| 2025-05-07 | 769.65 | Approved |
| 2025-05-08 | 770.00 | Approved |
| 2025-05-09 | 770.04 | Approved |
| 2025-05-10 | 770.37 | Approved |
| 2025-05-11 | 770.48 | Approved |
| 2025-05-12 | 770.40 | Approved |
| 2025-05-13 | 770.18 | Approved |
| 2025-05-14 | 769.90 | Approved |
| 2025-05-15 | 769.58 | Approved |
| 2025-05-16 | 769.27 | Approved |
| 2025-05-17 | 769.10 | Approved |
| 2025-05-18 | 769.03 | Approved |
| 2025-05-19 | 768.85 | Approved |
| 2025-05-20 | 768.66 | Approved |
| 2025-05-21 | 768.63 | Approved |
| 2025-05-22 | 768.72 | Approved |
| 2025-05-23 | 768.84 | Approved |
| 2025-05-24 | 768.79 | Approved |
| 2025-05-25 | 768.64 | Approved |
| 2025-05-26 | 768.50 | Approved |
| 2025-05-27 | 768.32 | Approved |
| 2025-05-28 | 768.14 | Approved |
| 2025-05-29 | 767.93 | Approved |
| 2025-05-30 | 767.71 | Approved |
| 2025-05-31 | 767.64 | Approved |
| 2025-06-01 | 767.71 | Approved |
| 2025-06-02 | 767.69 | Approved |
| 2025-06-03 | 767.58 | Approved |
| 2025-06-04 | 767.56 | Approved |
| 2025-06-05 | 767.54 | Approved |
| 2025-06-06 | 767.51 | Approved |
| 2025-06-07 | 767.56 | Approved |
| 2025-06-08 | 767.68 | Approved |
| 2025-06-09 | 767.77 | Approved |
| 2025-06-10 | 768.03 | Approved |
| 2025-06-11 | 768.22 | Approved |
| 2025-06-12 | 768.23 | Approved |
| 2025-06-13 | 768.07 | Approved |
| 2025-06-14 | 767.94 | Approved |
| 2025-06-15 | 767.81 | Approved |
| 2025-06-16 | 767.67 | Approved |
| 2025-06-17 | 767.49 | Approved |
| 2025-06-18 | 767.33 | Approved |
| 2025-06-19 | 767.19 | Approved |
| 2025-06-20 | 767.13 | Approved |
| 2025-06-21 | 767.00 | Approved |
| 2025-06-22 | 766.98 | Approved |
| 2025-06-23 | 766.92 | Approved |
| 2025-06-24 | 766.85 | Approved |
| 2025-06-25 | 766.75 | Approved |
| 2025-06-26 | 766.63 | Approved |
| 2025-06-27 | 766.56 | Approved |
| 2025-06-28 | 766.47 | Approved |
| 2025-06-29 | 766.42 | Approved |
| 2025-06-30 | 766.30 | Approved |
| 2025-07-01 | 766.23 | Approved |
| 2025-07-02 | 766.14 | Approved |
| 2025-07-03 | 766.03 | Approved |
| 2025-07-04 | 765.91 | Approved |
| 2025-07-05 | 765.80 | Approved |
| 2025-07-06 | 765.70 | Approved |
| 2025-07-07 | 765.60 | Approved |
| 2025-07-08 | 765.48 | Approved |
| 2025-07-09 | 765.36 | Approved |
| 2025-07-10 | 765.25 | Approved |
| 2025-07-11 | 765.16 | Approved |
| 2025-07-12 | 765.09 | Approved |
| 2025-07-13 | 765.02 | Approved |
| 2025-07-14 | 765.02 | Approved |
| 2025-07-15 | 764.96 | Approved |
| 2025-07-16 | 764.86 | Approved |
| 2025-07-17 | 764.82 | Approved |
| 2025-07-18 | 764.64 | Approved |
| 2025-07-19 | 764.52 | Approved |
| 2025-07-20 | 764.41 | Approved |
| 2025-07-21 | 764.27 | Approved |
| 2025-07-22 | 764.15 | Approved |
| 2025-07-23 | 764.03 | Approved |
| 2025-07-24 | 763.91 | Approved |
| 2025-07-25 | 763.78 | Approved |
| 2025-07-26 | 763.64 | Approved |
| 2025-07-27 | 763.59 | Approved |
| 2025-07-28 | 763.52 | Approved |
| 2025-07-29 | 763.38 | Approved |
| 2025-07-30 | 763.22 | Approved |
| 2025-07-31 | 763.06 | Approved |
| 2025-08-01 | 762.94 | Approved |
| 2025-08-02 | 762.83 | Approved |
| 2025-08-03 | 762.71 | Approved |
| 2025-08-04 | 762.57 | Approved |
| 2025-08-05 | 762.43 | Approved |
| 2025-08-06 | 762.30 | Approved |
| 2025-08-07 | 762.18 | Approved |
| 2025-08-08 | 762.06 | Approved |
| 2025-08-09 | 761.94 | Approved |
| 2025-08-10 | 761.82 | Approved |
| 2025-08-11 | 761.69 | Approved |
| 2025-08-12 | 761.55 | Approved |
| 2025-08-13 | 761.41 | Approved |
| 2025-08-14 | 761.28 | Approved |
| 2025-08-15 | 761.15 | Approved |
| 2025-08-16 | 761.03 | Approved |
| 2025-08-17 | 760.88 | Approved |
| 2025-08-18 | 760.71 | Approved |
| 2025-08-19 | 760.59 | Approved |
| 2025-08-20 | 760.48 | Approved |
| 2025-08-21 | 760.36 | Approved |
| 2025-08-22 | 760.25 | Approved |
| 2025-08-23 | 760.14 | Approved |
| 2025-08-24 | 759.98 | Approved |
| 2025-08-25 | 759.88 | Approved |
| 2025-08-26 | 759.75 | Approved |
| 2025-08-27 | 759.57 | Approved |
| 2025-08-28 | 759.44 | Approved |
| 2025-08-29 | 759.33 | Approved |
| 2025-08-30 | 759.21 | Approved |
| 2025-08-31 | 759.05 | Approved |
| 2025-09-01 | 758.92 | Approved |
| 2025-09-02 | 758.81 | Approved |
| 2025-09-03 | 758.69 | Approved |
| 2025-09-04 | 758.56 | Approved |
| 2025-09-05 | 758.51 | Approved |
| 2025-09-06 | 758.42 | Approved |
| 2025-09-07 | 758.35 | Approved |
| 2025-09-08 | 758.23 | Approved |
| 2025-09-09 | 758.07 | Approved |
| 2025-09-10 | 757.93 | Approved |
| 2025-09-11 | 757.79 | Approved |
| 2025-09-12 | 757.66 | Approved |
| 2025-09-13 | 757.54 | Approved |
| 2025-09-14 | 757.39 | Approved |
| 2025-09-15 | 757.25 | Approved |
| 2025-09-16 | 757.13 | Approved |
| 2025-09-17 | 757.00 | Approved |
| 2025-09-18 | 756.88 | Approved |
| 2025-09-19 | 756.72 | Approved |
| 2025-09-20 | 756.54 | Approved |
| 2025-09-21 | 756.42 | Approved |
| 2025-09-22 | 756.30 | Approved |
| 2025-09-23 | 756.17 | Approved |
| 2025-09-24 | 756.04 | Approved |
| 2025-09-25 | 756.07 | Approved |
| 2025-09-26 | 756.05 | Approved |
| 2025-09-27 | 755.95 | Approved |
| 2025-09-28 | 755.88 | Approved |
| 2025-09-29 | 755.78 | Approved |
| 2025-09-30 | 755.62 | Approved |
| 2025-10-01 | 755.47 | Approved |
| 2025-10-02 | 755.39 | Approved |
| 2025-10-03 | 755.26 | Approved |
| 2025-10-04 | 755.12 | Approved |
| 2025-10-05 | 754.99 | Approved |
| 2025-10-06 | 754.87 | Approved |
| 2025-10-07 | 754.75 | Approved |
| 2025-10-08 | 754.72 | Approved |
| 2025-10-09 | 754.61 | Approved |
| 2025-10-10 | 754.51 | Approved |
| 2025-10-11 | 754.36 | Approved |
| 2025-10-12 | 754.18 | Approved |
| 2025-10-13 | 754.03 | Approved |
| 2025-10-14 | 753.99 | Approved |
| 2025-10-15 | 753.86 | Approved |
| 2025-10-16 | 753.71 | Approved |
| 2025-10-17 | 753.58 | Approved |
| 2025-10-18 | 753.45 | Approved |
| 2025-10-19 | 753.31 | Approved |
| 2025-10-20 | 753.26 | Approved |
| 2025-10-21 | 753.12 | Approved |
| 2025-10-22 | 752.99 | Approved |
| 2025-10-23 | 752.89 | Approved |
| 2025-10-24 | 752.72 | Approved |
| 2025-10-25 | 752.57 | Approved |
| 2025-10-26 | 752.43 | Approved |
| 2025-10-27 | 752.28 | Approved |
| 2025-10-28 | 752.13 | Approved |
| 2025-10-29 | 752.01 | Approved |
| 2025-10-30 | 751.86 | Approved |
| 2025-10-31 | 752.21 | Approved |
| 2025-11-01 | 752.23 | Approved |
| 2025-11-02 | 752.20 | Approved |
| 2025-11-03 | 752.19 | Approved |
| 2025-11-04 | 752.20 | Approved |
| 2025-11-05 | 752.14 | Approved |
| 2025-11-06 | 752.19 | Approved |
| 2025-11-07 | 752.14 | Approved |
| 2025-11-08 | 752.18 | Approved |
| 2025-11-09 | 752.10 | Approved |
| 2025-11-10 | 752.25 | Approved |
| 2025-11-11 | 752.35 | Approved |
| 2025-11-12 | 752.35 | Approved |
| 2025-11-13 | 752.35 | Approved |
| 2025-11-14 | 752.33 | Approved |
| 2025-11-15 | 752.31 | Approved |
| 2025-11-16 | 752.43 | Approved |
| 2025-11-17 | 752.58 | Approved |
| 2025-11-18 | 752.63 | Approved |
| 2025-11-19 | 752.63 | Approved |
| 2025-11-20 | 752.65 | Approved |
| 2025-11-21 | 752.67 | Approved |
| 2025-11-22 | 752.67 | Approved |
| 2025-11-23 | 752.67 | Approved |
| 2025-11-24 | 752.67 | Approved |
| 2025-11-25 | 752.62 | Approved |
| 2025-11-26 | 752.70 | Approved |
| 2025-11-27 | 752.85 | Approved |
| 2025-11-28 | 752.96 | Approved |
| 2025-11-29 | 752.97 | Approved |
| 2025-11-30 | 752.99 | Approved |
| 2025-12-01 | 753.06 | Approved |
| 2025-12-02 | 753.02 | Approved |
| 2025-12-03 | 753.07 | Approved |
| 2025-12-04 | 753.13 | Approved |
| 2025-12-05 | 753.04 | Approved |
| 2025-12-06 | 753.01 | Approved |
| 2025-12-07 | 753.00 | Approved |
| 2025-12-08 | 752.97 | Approved |
| 2025-12-09 | 752.90 | Approved |
| 2025-12-10 | 752.87 | Approved |
| 2025-12-11 | 752.92 | Approved |
| 2025-12-12 | 752.88 | Approved |
| 2025-12-13 | 752.79 | Approved |
| 2025-12-14 | 752.75 | Approved |
| 2025-12-15 | 752.71 | Approved |
| 2025-12-16 | 752.66 | Approved |
| 2025-12-17 | 752.62 | Approved |
| 2025-12-18 | 752.55 | Approved |
| 2025-12-19 | 752.61 | Approved |
| 2025-12-20 | 752.80 | Approved |
| 2025-12-21 | 752.97 | Approved |
| 2025-12-22 | 753.05 | Approved |
| 2025-12-23 | 753.09 | Approved |
| 2025-12-24 | 753.12 | Approved |
| 2025-12-25 | 753.04 | Approved |
| 2025-12-26 | 752.94 | Approved |
| 2025-12-27 | 752.84 | Approved |
| 2025-12-28 | 752.66 | Approved |
| 2025-12-29 | Unavailable | invalid — Missing or nonfinite observation (ESTIMATED) |
| 2025-12-30 | 752.56 | Approved |
| 2025-12-31 | 752.49 | Approved |
| 2026-01-01 | 752.43 | Approved |
| 2026-01-02 | 752.37 | Approved |
| 2026-01-03 | 752.33 | Approved |
| 2026-01-04 | 752.25 | Approved |
| 2026-01-05 | 752.17 | Approved |
| 2026-01-06 | 752.09 | Approved |
| 2026-01-07 | 752.06 | Approved |
| 2026-01-08 | 751.98 | Approved |
| 2026-01-09 | 751.91 | Approved |
| 2026-01-10 | 751.87 | Approved |
| 2026-01-11 | 752.01 | Approved |
| 2026-01-12 | 752.19 | Approved |
| 2026-01-13 | 752.28 | Approved |
| 2026-01-14 | 752.34 | Approved |
| 2026-01-15 | 752.45 | Approved |
| 2026-01-16 | 752.52 | Approved |
| 2026-01-17 | 752.48 | Approved |
| 2026-01-18 | 752.40 | Approved |
| 2026-01-19 | 752.29 | Approved |
| 2026-01-20 | 752.15 | Approved |
| 2026-01-21 | 751.96 | Approved |
| 2026-01-22 | 751.80 | Approved |
| 2026-01-23 | 751.63 | Provisional |
| 2026-01-24 | 751.41 | Provisional |
| 2026-01-25 | 751.23 | Provisional |
| 2026-01-26 | 751.17 | Provisional |
| 2026-01-27 | 751.06 | Provisional |
| 2026-01-28 | 750.95 | Provisional |
| 2026-01-29 | 750.84 | Provisional |
| 2026-01-30 | 750.72 | Provisional |
| 2026-01-31 | 750.60 | Provisional |
| 2026-02-01 | 750.51 | Provisional |
| 2026-02-02 | 750.41 | Provisional |
| 2026-02-03 | 750.31 | Provisional |
| 2026-02-04 | 750.23 | Provisional |
| 2026-02-05 | 750.13 | Provisional |
| 2026-02-06 | 750.05 | Provisional |
| 2026-02-07 | 750.03 | Provisional |
| 2026-02-08 | 749.94 | Provisional |
| 2026-02-09 | 749.87 | Provisional |
| 2026-02-10 | 749.80 | Provisional |
| 2026-02-11 | 749.78 | Provisional |
| 2026-02-12 | 749.73 | Provisional |
| 2026-02-13 | 749.68 | Provisional |
| 2026-02-14 | 749.64 | Provisional |
| 2026-02-15 | 749.56 | Provisional |
| 2026-02-16 | 749.52 | Provisional |
| 2026-02-17 | 749.48 | Provisional |
| 2026-02-18 | 749.41 | Provisional |
| 2026-02-19 | 749.35 | Provisional |
| 2026-02-20 | 749.34 | Provisional |
| 2026-02-21 | 749.35 | Provisional |
| 2026-02-22 | 749.30 | Provisional |
| 2026-02-23 | 749.27 | Provisional |
| 2026-02-24 | 749.25 | Provisional |
| 2026-02-25 | 749.19 | Provisional |
| 2026-02-26 | 749.16 | Provisional |
| 2026-02-27 | 749.09 | Provisional |
| 2026-02-28 | 749.04 | Provisional |
| 2026-03-01 | 748.99 | Provisional |
| 2026-03-02 | 748.92 | Provisional |
| 2026-03-03 | 748.86 | Provisional |
| 2026-03-04 | 748.84 | Provisional |
| 2026-03-05 | 748.77 | Provisional |
| 2026-03-06 | 748.79 | Provisional |
| 2026-03-07 | 748.79 | Provisional |
| 2026-03-08 | 748.87 | Provisional |
| 2026-03-09 | 749.14 | Provisional |
| 2026-03-10 | 749.59 | Provisional |
| 2026-03-11 | 750.40 | Provisional |
| 2026-03-12 | 751.82 | Provisional |
| 2026-03-13 | 753.02 | Provisional |
| 2026-03-14 | 753.71 | Provisional |
| 2026-03-15 | 754.10 | Provisional |
| 2026-03-16 | 754.46 | Provisional |
| 2026-03-17 | 755.47 | Provisional |
| 2026-03-18 | 756.38 | Provisional |
| 2026-03-19 | 756.90 | Provisional |
| 2026-03-20 | 757.28 | Provisional |
| 2026-03-21 | 757.65 | Provisional |
| 2026-03-22 | 757.95 | Provisional |
| 2026-03-23 | 758.20 | Provisional |
| 2026-03-24 | 758.40 | Provisional |
| 2026-03-25 | 758.52 | Provisional |
| 2026-03-26 | 758.64 | Provisional |
| 2026-03-27 | 759.06 | Provisional |
| 2026-03-28 | 759.55 | Provisional |
| 2026-03-29 | 759.81 | Provisional |
| 2026-03-30 | 759.99 | Provisional |
| 2026-03-31 | 760.42 | Provisional |
| 2026-04-01 | 762.04 | Provisional |
| 2026-04-02 | 763.32 | Provisional |
| 2026-04-03 | 764.12 | Provisional |
| 2026-04-04 | 764.78 | Provisional |
| 2026-04-05 | 765.39 | Provisional |
| 2026-04-06 | 765.93 | Provisional |
| 2026-04-07 | 766.35 | Provisional |
| 2026-04-08 | 766.64 | Provisional |
| 2026-04-09 | 766.91 | Provisional |
| 2026-04-10 | 767.12 | Provisional |
| 2026-04-11 | 767.24 | Provisional |
| 2026-04-12 | 767.31 | Provisional |
| 2026-04-13 | 767.45 | Provisional |
| 2026-04-14 | 767.57 | Provisional |
| 2026-04-15 | 767.70 | Provisional |
| 2026-04-16 | 767.86 | Provisional |
| 2026-04-17 | 767.99 | Provisional |
| 2026-04-18 | 768.07 | Provisional |
| 2026-04-19 | 768.21 | Provisional |
| 2026-04-20 | 768.32 | Provisional |
| 2026-04-21 | 768.37 | Provisional |
| 2026-04-22 | 768.35 | Provisional |
| 2026-04-23 | 768.31 | Provisional |
| 2026-04-24 | 768.14 | Provisional |
| 2026-04-25 | 767.97 | Provisional |
| 2026-04-26 | 767.77 | Provisional |
| 2026-04-27 | 767.55 | Provisional |
| 2026-04-28 | 767.34 | Provisional |
| 2026-04-29 | 767.16 | Provisional |
| 2026-04-30 | 767.18 | Provisional |
| 2026-05-01 | 767.24 | Provisional |
| 2026-05-02 | 767.32 | Provisional |
| 2026-05-03 | 767.35 | Provisional |
| 2026-05-04 | 767.39 | Provisional |
| 2026-05-05 | 767.44 | Provisional |
| 2026-05-06 | 767.48 | Provisional |
| 2026-05-07 | 767.55 | Provisional |
| 2026-05-08 | 767.50 | Provisional |
| 2026-05-09 | 767.40 | Provisional |
| 2026-05-10 | 767.37 | Provisional |
| 2026-05-11 | 767.26 | Provisional |
| 2026-05-12 | 767.13 | Provisional |
| 2026-05-13 | 767.01 | Provisional |
| 2026-05-14 | 766.99 | Provisional |
| 2026-05-15 | 767.12 | Provisional |
| 2026-05-16 | 767.24 | Provisional |
| 2026-05-17 | 767.32 | Provisional |
| 2026-05-18 | 767.37 | Provisional |
| 2026-05-19 | 767.42 | Provisional |
| 2026-05-20 | 767.47 | Provisional |
| 2026-05-21 | 767.40 | Provisional |
| 2026-05-22 | 767.35 | Provisional |
| 2026-05-23 | 767.31 | Provisional |
| 2026-05-24 | 767.33 | Provisional |
| 2026-05-25 | 767.55 | Provisional |
| 2026-05-26 | 767.84 | Provisional |
| 2026-05-27 | 767.95 | Provisional |
| 2026-05-28 | 767.90 | Provisional |
| 2026-05-29 | 767.85 | Provisional |
| 2026-05-30 | 767.63 | Provisional |
| 2026-05-31 | 767.46 | Provisional |
| 2026-06-01 | 767.21 | Provisional |
| 2026-06-02 | 766.98 | Provisional |
| 2026-06-03 | 766.89 | Provisional |
| 2026-06-04 | 766.87 | Provisional |
| 2026-06-05 | 766.84 | Provisional |
| 2026-06-06 | 766.82 | Provisional |
| 2026-06-07 | 766.74 | Provisional |
| 2026-06-08 | 766.66 | Provisional |
| 2026-06-09 | 766.61 | Provisional |
| 2026-06-10 | 766.53 | Provisional |
| 2026-06-11 | 766.49 | Provisional |
| 2026-06-12 | 766.45 | Provisional |
| 2026-06-13 | 766.36 | Provisional |
| 2026-06-14 | 766.28 | Provisional |
| 2026-06-15 | 766.32 | Provisional |
| 2026-06-16 | 766.25 | Provisional |
| 2026-06-17 | 766.18 | Provisional |
| 2026-06-18 | 766.24 | Provisional |
| 2026-06-19 | 766.27 | Provisional |
| 2026-06-20 | 766.19 | Provisional |
| 2026-06-21 | 766.09 | Provisional |
| 2026-06-22 | 766.04 | Provisional |
| 2026-06-23 | 766.07 | Provisional |
| 2026-06-24 | 766.05 | Provisional |
| 2026-06-25 | 765.97 | Provisional |
| 2026-06-26 | 765.93 | Provisional |
| 2026-06-27 | 765.84 | Provisional |
| 2026-06-28 | 765.76 | Provisional |
| 2026-06-29 | 765.66 | Provisional |
| 2026-06-30 | 765.57 | Provisional |
| 2026-07-01 | 765.51 | Provisional |
| 2026-07-02 | 765.43 | Provisional |
| 2026-07-03 | 765.32 | Provisional |
| 2026-07-04 | 765.20 | Provisional |
| 2026-07-05 | 765.06 | Provisional |
| 2026-07-06 | 764.94 | Provisional |
| 2026-07-07 | 764.84 | Provisional |
| 2026-07-08 | 764.75 | Provisional |
| 2026-07-09 | 764.63 | Provisional |
| 2026-07-10 | 764.49 | Provisional |
| 2026-07-11 | 764.35 | Provisional |
| 2026-07-12 | 764.22 | Provisional |
| 2026-07-13 | 764.10 | Provisional |
| 2026-07-14 | 763.99 | Provisional |
| 2026-07-15 | 763.83 | Provisional |
| 2026-07-16 | 763.70 | Provisional |
| 2026-07-17 | 763.54 | Provisional |
| 2026-07-18 | 763.44 | Provisional |
| 2026-07-19 | 763.33 | Provisional |
| 2026-07-20 | 763.20 | Provisional |
| 2026-07-21 | 763.05 | Provisional |
| 2026-07-22 | 762.99 | Provisional |
| 2026-07-23 | 762.80 | Provisional |
| 2026-07-24 | 762.66 | Provisional |
| 2026-07-25 | 762.51 | Provisional |
| 2026-07-26 | 762.37 | Provisional |
| 2026-07-27 | 762.25 | Provisional |
| 2026-07-28 | 762.13 | Provisional |
| 2026-07-29 | 762.34 | Provisional |
| 2026-07-30 | 762.91 | Provisional |
| 2026-07-31 | 763.07 | Provisional |
| 2026-08-01 | 763.08 | Provisional |
| 2026-08-02 | 763.03 | Provisional |
| 2026-08-03 | 763.16 | Provisional |
| 2026-08-04 | 763.17 | Provisional |
| 2026-08-05 | 763.11 | Provisional |
| 2026-08-06 | 763.04 | Provisional |
| 2026-08-07 | 762.96 | Provisional |
| 2026-08-08 | 762.88 | Provisional |
| 2026-08-09 | 762.81 | Provisional |
| 2026-08-10 | 762.69 | Provisional |
| 2026-08-11 | 762.58 | Provisional |
| 2026-08-12 | 762.48 | Provisional |
| 2026-08-13 | 762.36 | Provisional |
| 2026-08-14 | 762.25 | Provisional |
| 2026-08-15 | 762.14 | Provisional |
| 2026-08-16 | 762.02 | Provisional |
| 2026-08-17 | 761.91 | Provisional |
| 2026-08-18 | 761.78 | Provisional |
| 2026-08-19 | 761.67 | Provisional |
| 2026-08-20 | 761.53 | Provisional |
| 2026-08-21 | 761.37 | Provisional |
| 2026-08-22 | 761.25 | Provisional |
| 2026-08-23 | 761.15 | Provisional |
| 2026-08-24 | 761.06 | Provisional |
| 2026-08-25 | 760.93 | Provisional |
| 2026-08-26 | 760.78 | Provisional |
| 2026-08-27 | 760.68 | Provisional |
| 2026-08-28 | 760.65 | Provisional |
| 2026-08-29 | 760.53 | Provisional |
| 2026-08-30 | 760.40 | Provisional |
| 2026-08-31 | 760.27 | Provisional |
| 2026-09-01 | 760.21 | Provisional |
| 2026-09-02 | 760.18 | Provisional |
| 2026-09-03 | 760.10 | Provisional |
| 2026-09-04 | 760.00 | Provisional |
| 2026-09-05 | 759.87 | Provisional |
| 2026-09-06 | 759.74 | Provisional |
| 2026-09-07 | 759.64 | Provisional |
| 2026-09-08 | 759.51 | Provisional |
| 2026-09-09 | 759.42 | Provisional |
| 2026-09-10 | 759.41 | Provisional |
| 2026-09-11 | 759.29 | Provisional |
| 2026-09-12 | 759.20 | Provisional |
| 2026-09-13 | 759.15 | Provisional |
| 2026-09-14 | 759.08 | Provisional |
| 2026-09-15 | 758.98 | Provisional |
| 2026-09-16 | 758.89 | Provisional |
| 2026-09-17 | 758.80 | Provisional |
Comparable prior years
Same provider calendar date as 2026-09-17, within the fixed 2006–2025 reference interval. 2 eligible distinct years: 2024, 2025
| Date | Level | Quality |
|---|---|---|
| 2024-09-17 | 760.38 ft | Approved |
| 2025-09-17 | 757.00 ft | Approved |
Percentiles disabled in the frozen methodology. A short captured history is not a long-term seasonal norm. Daily mean sampling completeness is unverified.
Extrema within the captured window
Eligible original-resolution daily mean values from 2024-01-01 through 2026-09-18; these are not all-time instantaneous records. All tied dates are listed.
Lowest
748.77 ft
2026-03-05
Highest
770.82 ft
2024-04-15
Provider-reported daily means: sampling completeness is unverified for 969 eligible days. Missing observations can hide more extreme values.
Includes provisional observations; extrema may change with provider corrections.
| Year / window | Low / tied dates | High / tied dates | Coverage |
|---|---|---|---|
| 20242024-01-01 to 2024-12-31 | 753.562024-12-10 | 770.822024-04-15 | 363/366 days |
| 20252025-01-01 to 2025-12-31 | 748.802025-03-05 | 770.482025-05-11 | 346/365 days |
| 20262026-01-01 to 2026-09-18 (incomplete year) | 748.772026-03-05 | 768.372026-04-21 | 260/261 days |
Source and measurement reference
- Historical series
- 1b0dac4956eb4f0c9128dbaa7a48b92d
- Parameter / statistic
- 62615 / 00003
- Water-surface datum segment
- NAVD 1988 / usgs-01323500-62615:verified-2024
- Native unit
- ft. Foot subtype not established; no unit conversion is offered.
Values from USGS. No agency endorsement is implied. A changed datum or incompatible series is excluded from comparisons and breaks the chart line.
Captured history uses the reviewed datum interval. Forward refresh requires unchanged exact series, unit, parameter and explicit datum metadata; it cannot prove absence of undocumented historical changes.